UM Campus Tail

Projects>
Fernan Lake Road
Salmon River Road
Hurricane Ridge Road
North Umpqua Highway
Orange Street Bridge
UM Bike/Ped Trail



University of Montana Bike/Ped Trail
Client:  University of Montana            Where:   Missoula, MT

Project Scope
DJ&A performed the design and construction management for a CTEP funded pedestrian trail near the Madison Street Bridge (Missoula, MT). The design phase of the project began in the summer of 2006 with construction in the spring of 2007.

Design Phase
Project included approximately 520 linear feet of 8 foot wide paved pedestrian and bike trail included an approximately 40 foot long hand rail section across an existing drainage culvert. Tasks performed by DJ&A, P.C. included surveying and route location. The route location was developed from input from the University of Montana and the Missoula Parks Department. ADA compliance was a large aspect for the trail way with input from CTEP representatives of the Montana Department of Transportation. DJ&A, P.C. assisted in the bidding process and selection of a qualified contractor to complete the work.

Construction Phase
DJ&A, P.C. provided construction staking, on site inspection, payment request and prepared the project closeout documentation.

Project Photos
Trail Connects to Madison Pedestrian Bridge UM Trail
 
 
  DJ&A, P.C. 
3203 Russell Street / Missoula, MT, 59801
P: 406/721-4320  F: 406/549-6371
 
DJ&A, P.C.
 
UM Trail Crossing