I-90 Bridge, Bonner, MT

Projects>
I-90 Bridge
Canyon Ferry Cabin Sites
Going-to-the-Sun Road
Gibson Dam
DeBaugan Fuels Cadastral

Cascade Lake



I-90 Bridge Survey
Client:  Spaulding Construction / US Army Corps of Engineers
Where
:   Bonner, MT

Project Scope
DJ&A was responsible for supplying all labor, materials, equipment, etc. in order to provide the following additional surveying services for I-90 Bridge:

  • Establish/verify Horizontal and Vertical Control Points
  • Establish cut elevations I-90 West Bound Lane Casings
  • Map existing conditions
  • High Definition Laser Scanning
  • Survey in remaining final designed tip/rock socket elevations
  • Final caisson elevation as-builts
  • Survey in newly installed seal (I-90 East & West Bound Lanes) as-builts
  • Survey in new footer (I-90 East & West Bond Lanes) as-builts
  • I-90 Structure Deformation Monitoring
Project Photos
I-90 Bridge Surveying the new footer HD Survey Laser Scan for monitoring
 
 
  DJ&A, P.C. 
3203 Russell Street / Missoula, MT, 59801
P: 406/721-4320  F: 406/549-6371
Visit our Linkedin page Connect with us on Linkedin
DJ&A, P.C.